According to the Public Relations and International Affairs Department of the Arak Metropolitan Municipality, with the aim of organizing and properly directing surface water and preventing problems caused by water accumulation during the rainy season, work to improve the surface water drainage system and install curbstones in Namdar 5 Alley, Shahid Safari, has begun. Also, resurfacing work on the underpass at Enghelab Square, opposite Abolfazl Town (AS), is underway with the aim of improving the route and enhancing traffic safety. In continuation of these efforts and following the پیگیریهای شهرداری اراک and cooperation of property owners, Shahid Ebrahimi Street toward Qaleh Sanjan neighborhood was reopened; an action that, in addition to facilitating residents' access, plays an important role in improving traffic and developing the streets of this area.
Short link:
omran.arak.ir/s/sc0043